Nedgia Getafe biomethane homes C for Air Conditioning

A community of residents in Getafe replaces diesel with a hybrid system using biomethane.

A community of 133 homes in Getafe (Madrid) has completed a comprehensive rehabilitation that has allowed him Replace an old centralized oil boiler with a hybrid system designed to run on biomethane, achieving a saving of more than 60% of primary energy.

The project, promoted by nedgia and executed by Enveloping, combine condensing boilers, aerothermal energy and photovoltaic self-consumptionalong with insulation work on the facade and roof. The new installation already supplies heating and hot water with green gas, maintaining the comfort of the residents and significantly reducing CO₂ emissions.

The performance featured Next Generation fundswhich have allowed for a profound reform without the need to modify existing infrastructure, demonstrating the The role of biomethane in the decarbonization of the residential stock.

Full news in Air Conditioning and Comfort:
https://climatizacion-y-confort.cdecomunicacion.es/noticias/energias-renovables/152561/de-gasoleo-a-gases-verdes-la-rehabilitacion-de-una-comunidad-que-ha-logrado-un-ahorro-del-60

logo-salondelgasrenovable
Privacy summary

In our Privacy Policy we explain how our organization handles any information relating to our customers, suppliers or employees that we have collected in our operations. Privacy Policy